Client
Enterprise Products
12 million dollars
Scope and result
Packaged four GT 22 YORK propane compressors driven by Allison 501KC gas turbines. GTS delivered the complete turnkey project.

Track record
From control retrofits across an 850 mile pipeline to complete power plants delivered across the world, GTS takes responsibility for results.
0
Founded
0+
Years of Service
0+
Years Combined Turbine Experience
0 MW
Projects up to
US Navy
Excellence Award

United States Navy • Guam
Won a United States government bid to engineer, procure, and construct an 18 megawatt power plant at Naval Air Station Guam. With only the Westinghouse W191 gas turbine supplied, GTS engineered and built the complete plant from the ground up.
Designed for unmanned operation through 180 mph typhoons and magnitude 8 earthquakes. State of the art for 1989. GTS received a United States Navy excellence award. Admiral Larson performed the opening ceremony.
20 million dollars
Selected experience
Client
12 million dollars
Scope and result
Packaged four GT 22 YORK propane compressors driven by Allison 501KC gas turbines. GTS delivered the complete turnkey project.
Client
22 turbine retrofits
Scope and result
Retrofitted 22 GT 22 turbines with OPTO 22 control systems and upgraded pipeline compressors with John Crane dry seals along the 850 mile Waxahachie to Katy line, the largest gas pipeline in Texas.
Client
140 million dollars
Scope and result
Delivered a 140 megawatt combined cycle plant in Pakistan with Fiat Avio of Torino, Italy, using GE LM6000 aero gas turbines. GTS supplied installation expertise and supervised civil, mechanical, and electrical works alongside WAPDA in 1999.
Client
50 megawatts
Scope and result
Delivered major power generation capability in Bangladesh as part of a project record spanning demanding international markets.
Client
More than 15 million dollars
Scope and result
Engineered, procured, and constructed two catcracker gas compressors driven by aero derivative gas turbines in Arkansas City, Kansas. The 1987 project was the first jet engine installation at a catcracker.
GTS and American Air Filter developed an advanced inlet air system to protect turbine blades from fine catalyst particles.
Client
More than 10 million dollars
Scope and result
Built open architecture PLC 5 control software and SCADA for 17 Man Turbo and Hispano Suiza THM gas turbines offshore Brazil. The project was delivered on time.
Client
First of its kind
Scope and result
Brought the first Chinese drilling rig from China to Colorado, United States, opening a new path for international drilling equipment deployment.
Client
Ongoing since 2016
Scope and result
Provided six 3500 KW mobile gas turbine generators at 13.8 KV and 60 Hz to power 10,000 PSIG, 6000 HP electric AC frac pumps for a Colorado company.
A pioneering electric fracking deployment powered by mobile gas turbine generation.

Worldwide capability
Approximately 35 years of offshore experience and projects across North America, South America, and Asia have built a team prepared for complex access, logistics, controls, and operating demands.
United States Navy excellence award for turnkey delivery in Guam.
Trusted by










Start the conversation